WISDRI has completed more than 165 green-field and/or brown-field BF projects in E, EP or EPC mode, in which BFs with volume over 1000m3 account for nearly 1/3 of the total domestic BF installations, ranking no.1 in China. Taking the lead in aspect of longer-campaign, efficient operation, and energy saving and environmental protection, we boast having the most references of large-sized BFs across the globe. We are also proud to say that we designed the world's largest blast furance operating as of today, i.e. Shagang 5800m3 blast furnace, which was commissioned in 2009.
Zip: 430223 Tel: 0086 27 81996178 Fax: 0086-81996666-04088 Email: 04088@louzhijia.com